Incorrect handling of H/2 GOAWAY followed by SETTINGS frames
Default status is the baseline for the product, each version can override it (e.g. patched versions marked unaffected).
| Vendor | Product | Default status | Versions | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| envoyproxy | envoy | affected |
|
Configuration 1 [-]
|
No data.
No data available yet.
| Source | ID | Title |
|---|---|---|
EUVD |
EUVD-2021-19544 | Envoy is an open source L7 proxy and communication bus designed for large modern service oriented architectures. In affected versions Envoy transitions a H/2 connection to the CLOSED state when it receives a GOAWAY frame without any streams outstanding. The connection state is transitioned to DRAINING when it receives a SETTING frame with the SETTINGS_MAX_CONCURRENT_STREAMS parameter set to 0. Receiving these two frames in the same I/O event results in abnormal termination of the Envoy process due to invalid state transition from CLOSED to DRAINING. A sequence of H/2 frames delivered by an untrusted upstream server will result in Denial of Service in the presence of untrusted **upstream** servers. Envoy versions 1.19.1, 1.18.4 contain fixes to stop processing of pending H/2 frames after connection transition to the CLOSED state. |
No CVSS v4.0
No CVSS v3.0
This CVE is not in the KEV list.
Exploit prediction score: 1.2% (1.230% probability within 30 days)
Key SSVC decision points have not yet been added.
No history.